March 9, 1953 (21st Parliament, 7th Session)

LIB

Mr. Blanchette: (Parliamentary Assistant to the Minister of National Defence)

Liberal

1. Construction of the playing field was planned in three stages. Erection of the

Questions
3. Answered by No. 1.
4. No. A very small portion of the seeded field was disturbed to permit the rounding of the corners to conform with the standard design of a cinder perimeter track.
5. No. The playing field has not yet been accepted and taken over from Defence Construction Limited. It is expected that the Department of National Defence will take over the field in the spring of 1953.
6. The total cost to date of the playing field is:
(a) land: nil, as the property is owned by the Department of National Defence.
(b) construction:
Bleachers $ 8,677.73
Playing field 11,900.00
Cinder track and perimeter fence... 19,555.00

Topic:   ROYAL MILITARY COLLEGE
Subtopic:   PLAYING FIELD